Installation.
Screwed to concrete floor using expansion plugs or threaded rod and epoxy. Finished
with compacted material coating either continuous wet-pour rubber surfacing or
rubber tiles.
Maintenance:
Checking: all fixing points, screws and bolts must be periodically checked and tightened
again if necessary. The checking date must be annotated in order to establish a control.
Inspections:
1. Routine visual inspection. An eye and functional inspection will be performed to verify that
you have not suffered any vandalism damage.
2. Functional inspection. This inspection will be carried out with a periodicity of 1 to 3 months
and attention should be paid to the components “sealed for life” and the equipment whose
stability depends on a post.
3. Annual inspection. A complete inspection of the whole set will be carried out in order to
verify that it meets all the sections of the standard and that it has not been modified.
Technical information
Animal: Build in polyester painted by mass, with
gel-coat of predominant colour and anti-graffiti
treatment.
Structure: Internal build in galvanized
steel pipe.
Platforms: Stepable zone realized
in high resistance continuous
wet-pour rubber
surfacing (EPDM).
Screws: On galvanized steel.
Anchoring: Galvanized steel for
mounting on concrete foundation.